OPEXOPEX

Digitized
manufacturing.

Skip the mold. Get production-grade plastic parts in days, priced live, iterated freely.

Drop your part — see what it'd cost without tooling…Quote
Instant DFM reviewIndustrial 3D printingFrom 1 to 10,000 parts

No molds. No minimums.

Skip the $50K–$250K+ tooling. Order one part or ten thousand at the same per-unit logic.

Production-grade plastics

Three end-use materials — Tough, Rigid and Flexible — on one scaled industrial 3D printing platform. Built for function, not prototypes.

Instant, transparent pricing

Upload CAD, get pricing and lead time in seconds. No back-and-forth, no surprise quotes.

UL 94 V-0UL 94 HBISO 10993-5ISO 10993-10CTI 600 VASTM D638ASTM D648ASTM D412ASTM D624Halogen-free FRREACHRoHSUL 94 V-0UL 94 HBISO 10993-5ISO 10993-10CTI 600 VASTM D638ASTM D648ASTM D412ASTM D624Halogen-free FRREACHRoHS

See your numbers

Drag the sliders.
Watch the math shift.

Below break-even, OPEX beats injection molding on total cost. Use it on your real volumes and complexity — no spreadsheet required.

Live savings

OPEX vs injection molding
1,000 pcs
Medium
Standard

Tooling skipped

$110,000

Lead time saved

8 weeks

1-yr savings

$109,355

Break-even with OPEX at ~99,999 pcs/yr — below that, you save vs molding. Smaller parts push break-even higher; larger parts lower it.

For reference only — an official quote is required for part-specific pricing.

How it works

From CAD to part. In days, not months.

Manufacturing challenge

Break the mold.
Skip the tooling.

We're onboarding 5 early adopters at a pilot rate 50% below standard quotes. Bring a part, ship a case study, help us prove out digitized manufacturing at series scale.

5 seats open
See the challenge
5
Pilot seats
-50%
Off standard quotes
01/27
Open until
Benchmark

Built to replace injection molding

Same end-use plastic parts. None of the tooling, lead time, or volume lock-in. We turn CAD into finished parts in hours — not months.

0×
faster to first part
$0K+
saved on tooling per part
24h
from CAD to shipped part
$0
upfront tooling investment
Split-screen comparison: a single heavy steel injection mold with one green plastic enclosure part versus a full grid of identical green 3D-printed parts under additive manufacturing printer nozzles — showing the shift from expensive tooling to limitless scale
Lead time
280×

faster to first part

Injection molding12–16 weeks
OPEX24 hours
Tooling cost
$0

molds. Ever.

Injection molding$50K–$250K+
OPEX$0
Minimum order
1pc

MOQ — order what you need

Injection molding10,000 units
OPEX1 unit
Design iterations
∞

revise between every batch

Injection moldingLocked after tooling
OPEXUnlimited

Skip the months of waiting. Start your build today.

Get an instant quote

Ready to see your part priced?

Upload a CAD file and get an instant quote with lead time and material recommendations.

Start a quote